Approx. 25 hours to bolt up turbo hardware will be a substantial labor cost. Hopefully there was some install lessons learned or hardware modification concept improvements which allows that to be cut back about half when it goes into production.
Quote:
Originally Posted by Vargasturbotech
Similar to stock location yes, water pump is relocated slightly forward, small things are changed. Its not a job for the timid. Its quite labor intensive. Double the install time of stockers and throw another 2 hours on top of that to be safe.
|