to get everything done in 45 minutes, i wouldn't think they can wrap the rails. However, when I had my roof wrapped last year, I paid additional 20 for each side to get it done. I think it looks much better with the rails wrapped, took them a good 30-40 minutes though. Raj, post some pics if you have any!
|