I already wrote to Andrew, describing the whole problem like above. Got the answer that the pipes have to be adjusted a bit.
Thats something I already know, I already spend hours with adjusting.
No reaction on the problem that I had to shorten the bolt.
Serious, there is nothing you can do wrong when pushing a bolt through the flange and tightening.
Asked him for details in which order he tighten up the v-bands and flange to eliminate the fact that I am possibly to dump for installing 2 pipes.
I would be happy if it is my fault, because shipping the pipes over sea to get new ones will take weeks.
Therefore I'm looking for suggestions how to do a proper install or what else could be wrong.
I will take a picture next time. Unfortunately I have a lot of work at the moment, will probably have time on next Thursday.
|