E90Post
 


Coby Wheel
 
BMW 3-Series (E90 E92) Forum > BMW E90/E92/E93 3-series General Forums > New & Preowned BMW Ordering / Pricing / Tracking Information Forum (including European Delivery) > In Production



Reply
 
Thread Tools Search this Thread
      12-18-2005, 05:39 PM   #1
Carl
Private
1
Rep
52
Posts

Drives: e91 red loaded
Join Date: Nov 2005
Location: Colorado

iTrader: (0)

In Production

Ok - my 325xit is finally in production this week (Ordered on Oct. 21st). Any Idea how I can track what stage the vehicle is in? BMWNA said they do not have access to the to the 3 digit codes anymore. All I know now is that is is sceduled to be completed 12/28

Thanks -- Also I was told tha Munich runs a 24/hr shift and is only shut down on Christmas -- any insights?
Appreciate 0
      12-18-2005, 08:21 PM   #2
tctic
Major
Canada
38
Rep
1,238
Posts

Drives: BMW E90
Join Date: Oct 2005
Location: Canada

iTrader: (0)

Takes about 1-1.5 month for delivery after production is done.
Appreciate 0
      12-18-2005, 10:45 PM   #3
CALIF65GM
Colonel
CALIF65GM's Avatar
97
Rep
2,041
Posts

Drives: e93-35 May08 ED
Join Date: Jun 2005
Location: SF, CA

iTrader: (0)

Garage List
Quote:
Originally Posted by Carl
Ok - my 325xit is finally in production this week (Ordered on Oct. 21st). Any Idea how I can track what stage the vehicle is in? BMWNA said they do not have access to the to the 3 digit codes anymore. All I know now is that is is sceduled to be completed 12/28
You can call the 800-831-1117 number and enter your production # to check the production status. It's a voice-operated system. They don't provide the 3-digit code, just the status (ie: Paint shop)
__________________
5-2-08 e93-35 ED Montego w/Jade Grey, Step w/Paddles, PP, SP, CA, hot seats and iPod.Awaing re-delivery soon.

Debadged 330xi ED 11/14/05 Auto/Mystic Blue/Gray leather with Alum/PP/SP/CA/Fold-down rear seats/Alarm. Sold to Carmax on 6/7/08 with 50,624 miles on clock
Appreciate 0
      12-18-2005, 11:09 PM   #4
kt157
Captain
kt157's Avatar
United_States
16
Rep
926
Posts

Drives: jet black 330i
Join Date: Sep 2005
Location: BayArea, CA

iTrader: (1)

the 800# and OC were way off on my car. i would say over a week off from other members. i say check with your dealer if u want the most accurate status.
Appreciate 0
      12-18-2005, 11:59 PM   #5
ksfrogman
Major General
ksfrogman's Avatar
United_States
574
Rep
6,750
Posts

Drives: E90 330i 6MT
Join Date: Nov 2005
Location: Torrance, CA

iTrader: (12)

Garage List
2006 330i  [0.00]
2006 330i  [0.00]
What is the "t" in "xit?"
__________________
Appreciate 0
      12-18-2005, 11:59 PM   #6
kobechrome
Captain
kobechrome's Avatar
United_States
38
Rep
699
Posts

Drives: 2013 F30 335xi
Join Date: Dec 2005
Location: Ashburn, VA

iTrader: (0)

Garage List
My dealer told me that Munich shuts down for 3 days over the holidays - not sure which 3 days though. My car is in production now though and is scheduled to complete production on 12/27 and it's being built in Munich.
__________________
Appreciate 0
      12-19-2005, 02:24 AM   #7
2006bmw
First Class Privates
2006bmw's Avatar
10
Rep
181
Posts

Drives: '06 330i
Join Date: Oct 2005
Location: L.A.

iTrader: (0)

my OC status was pretty much right on, especially once it got to the US. The 800 number was more accurate during production/shipping to the port
__________________
Conceived: 10/26/05 Born: 11/08/05 Delivered: 12/17/05 | 330i | 6 M/T | AW | Terra | Walnut | SPP | ZSP | CA
Appreciate 0
      12-20-2005, 12:05 AM   #8
CALIF65GM
Colonel
CALIF65GM's Avatar
97
Rep
2,041
Posts

Drives: e93-35 May08 ED
Join Date: Jun 2005
Location: SF, CA

iTrader: (0)

Garage List
Quote:
Originally Posted by ksfrogman
What is the "t" in "xit?"
the "t" stands for "Touring" ie: the wagon
__________________
5-2-08 e93-35 ED Montego w/Jade Grey, Step w/Paddles, PP, SP, CA, hot seats and iPod.Awaing re-delivery soon.

Debadged 330xi ED 11/14/05 Auto/Mystic Blue/Gray leather with Alum/PP/SP/CA/Fold-down rear seats/Alarm. Sold to Carmax on 6/7/08 with 50,624 miles on clock
Appreciate 0
      12-23-2005, 01:22 AM   #9
Lost Rider
Captain
Lost Rider's Avatar
United_States
87
Rep
805
Posts

Drives: R NineT, X1
Join Date: Dec 2005
Location: Ventura County, CA

iTrader: (0)

Garage List
2014 BMW R NineT  [0.00]
2015 X1 xdrive  [9.00]
Carl, looks like I'm a week behind you. My production date is 1/5/06.
__________________
Appreciate 0
      12-23-2005, 01:11 PM   #10
Carl
Private
1
Rep
52
Posts

Drives: e91 red loaded
Join Date: Nov 2005
Location: Colorado

iTrader: (0)

now comes the hard part

800 number had it in the paint shop yesterday and finished today! Now it's "waiting for transit" Any idea how to tell if it is already scheduled for a ship? How long it the transit time from Munich to the Port? 325ixt electric red, terra, loaded
Appreciate 0
      12-23-2005, 01:33 PM   #11
Ex's335
Private
Ex's335's Avatar
5
Rep
51
Posts

Drives: 95 civic,
Join Date: Sep 2005
Location: alabama

iTrader: (0)

Quote:
Originally Posted by Carl
Ok - my 325xit is finally in production this week (Ordered on Oct. 21st). Any Idea how I can track what stage the vehicle is in? BMWNA said they do not have access to the to the 3 digit codes anymore. All I know now is that is is sceduled to be completed 12/28

Thanks -- Also I was told tha Munich runs a 24/hr shift and is only shut down on Christmas -- any insights?
I don't know about the 24hr shift but I was told that the Munich plant was closed from the 17th to the 7th of Jan. That's what my dealer told me and that I can't pick up my car until the paper work is sent from Munich. I was also told that they closed down for 3wks in Nov. This is what a dealer told me. If your car is done you should have it soon.
__________________
06 BMW 325i SP,Xenon,Beige, Assist, Nav, Heated Seats, PDC, Logic 7,retired Black 07 BMW 335i coupe with Coral Red leather, Sport Pkg, Premium Pkg, CW Pkg, NAV, Steptronic with Paddle Shifters, Comfort Access, IPOD Retro-fit, Alarm, M-kit, M3 Spoiler
Appreciate 0
      12-23-2005, 01:59 PM   #12
Carl
Private
1
Rep
52
Posts

Drives: e91 red loaded
Join Date: Nov 2005
Location: Colorado

iTrader: (0)

I was told by BMWNA that Munich was only closing down for Christmas Day!
Appreciate 0
      12-23-2005, 04:24 PM   #13
Ex's335
Private
Ex's335's Avatar
5
Rep
51
Posts

Drives: 95 civic,
Join Date: Sep 2005
Location: alabama

iTrader: (0)

Quote:
Originally Posted by Carl
I was told by BMWNA that Munich was only closing down for Christmas Day!
I hope so but, I was told by two diffrent dealers in Germany that they was closed till the 8th. If not maybe I'll get my car soon. Good luck and I hope the dealers over here are wrong. It would make sense because of the amount of people ordering BMWs.
__________________
06 BMW 325i SP,Xenon,Beige, Assist, Nav, Heated Seats, PDC, Logic 7,retired Black 07 BMW 335i coupe with Coral Red leather, Sport Pkg, Premium Pkg, CW Pkg, NAV, Steptronic with Paddle Shifters, Comfort Access, IPOD Retro-fit, Alarm, M-kit, M3 Spoiler
Appreciate 0
      12-23-2005, 04:34 PM   #14
kobechrome
Captain
kobechrome's Avatar
United_States
38
Rep
699
Posts

Drives: 2013 F30 335xi
Join Date: Dec 2005
Location: Ashburn, VA

iTrader: (0)

Garage List
Quote:
Originally Posted by questjack06
I hope so but, I was told by two diffrent dealers in Germany that they was closed till the 8th. If not maybe I'll get my car soon. Good luck and I hope the dealers over here are wrong. It would make sense because of the amount of people ordering BMWs.
My car finished production yesterday but my Maryland dealer told me that Munich only shuts down for 24th, 25th, 26th so it shouldn't be a problem.
__________________
Appreciate 0
      12-23-2005, 04:42 PM   #15
Ex's335
Private
Ex's335's Avatar
5
Rep
51
Posts

Drives: 95 civic,
Join Date: Sep 2005
Location: alabama

iTrader: (0)

Great I'm going to call my dealer first thing Sat and get them hot. Thanks for the info. That makes more sense than the plant closing down for 3 weeks. :rocks:
__________________
06 BMW 325i SP,Xenon,Beige, Assist, Nav, Heated Seats, PDC, Logic 7,retired Black 07 BMW 335i coupe with Coral Red leather, Sport Pkg, Premium Pkg, CW Pkg, NAV, Steptronic with Paddle Shifters, Comfort Access, IPOD Retro-fit, Alarm, M-kit, M3 Spoiler
Appreciate 0
      12-25-2005, 11:02 AM   #16
zach
New Member
0
Rep
6
Posts

Drives: e91
Join Date: Nov 2005
Location: NY, NY

iTrader: (0)

I though I was the only one that had been waiting FOREVER on the xiT - Ordered Nov 10 - went into production few days ago on the on the 22nd (was scheduled as a week 52 build). Just called the 800 number and they have a scheduled completion of Jan 5th. Based on what I have seen from others here on time in production, that tells me the factory is definitley taking more than a couple days off for the holidays.....
Appreciate 0
      12-25-2005, 11:11 AM   #17
Carl
Private
1
Rep
52
Posts

Drives: e91 red loaded
Join Date: Nov 2005
Location: Colorado

iTrader: (0)

Mine was scheduled for week 52 as well with a schedule completion date of the 28th - Production for it stated on the 19th and was finished on the 22nd Four days.
Appreciate 0
      12-25-2005, 06:50 PM   #18
Lost Rider
Captain
Lost Rider's Avatar
United_States
87
Rep
805
Posts

Drives: R NineT, X1
Join Date: Dec 2005
Location: Ventura County, CA

iTrader: (0)

Garage List
2014 BMW R NineT  [0.00]
2015 X1 xdrive  [9.00]
I ordered my E91 xiT on Dec. 16th. I also have a completion date of 1/5. Looks like we could be on the same boat coming over zach.
__________________
Appreciate 0
      12-26-2005, 10:35 PM   #19
steverequiem
Enlisted Member
0
Rep
34
Posts

Drives: e90 325i
Join Date: Dec 2005
Location: Bethesda, MD

iTrader: (0)

I ordered on 12/14. Scheduled to be finished on 1/5. Hopefully I'll be on the boat with you all.
Appreciate 0
      12-27-2005, 05:09 PM   #20
kobechrome
Captain
kobechrome's Avatar
United_States
38
Rep
699
Posts

Drives: 2013 F30 335xi
Join Date: Dec 2005
Location: Ashburn, VA

iTrader: (0)

Garage List
Quote:
Originally Posted by Carl
Mine was scheduled for week 52 as well with a schedule completion date of the 28th - Production for it stated on the 19th and was finished on the 22nd Four days.
Maybe we'll be on the same boat if you are taking regular delivery. My car also finished production to 22nd. As of this morning, it was on the way to the port.
__________________
Appreciate 0
      01-04-2006, 02:29 PM   #21
Lost Rider
Captain
Lost Rider's Avatar
United_States
87
Rep
805
Posts

Drives: R NineT, X1
Join Date: Dec 2005
Location: Ventura County, CA

iTrader: (0)

Garage List
2014 BMW R NineT  [0.00]
2015 X1 xdrive  [9.00]
My status yesterday was in the "paint shop" with completion on the 5th, and now it says "on the way to port of exit". 1 day ahead of schedule.
Anyone else's car that was supposed to be completed on the 5th finish early?
I hope it gets on the ship " Courage" instead of "ATLANTIC CONVEYOR" since courage makes the trip 4 days faster
I'm also hoping that the factory holiday shut down will work to my advantage and there's not too many cars in front of mine, both on the export and import sides.

__________________
Appreciate 0
      01-04-2006, 04:29 PM   #22
kobechrome
Captain
kobechrome's Avatar
United_States
38
Rep
699
Posts

Drives: 2013 F30 335xi
Join Date: Dec 2005
Location: Ashburn, VA

iTrader: (0)

Garage List
Quote:
Originally Posted by ChiTown
My status yesterday was in the "paint shop" with completion on the 5th, and now it says "on the way to port of exit". 1 day ahead of schedule.
Anyone else's car that was supposed to be completed on the 5th finish early?
I hope it gets on the ship " Courage" instead of "ATLANTIC CONVEYOR" since courage makes the trip 4 days faster
I'm also hoping that the factory holiday shut down will work to my advantage and there's not too many cars in front of mine, both on the export and import sides.

The factory was not shut down except for 2-3 days. My car went into PROD on 12/19 and finished on 12/22... I was loaded on the Jingu Maru 12/30 and it left Bremerhaven on 1/2 - it's due to dock in NY on 1/13... so I'm hoping to have my car one week after that.

One thing that drove me crazy was that I waited at the port from 12/26 until 1/2 - 3 other ships for NY left before I finally got on one... looks like even during the holidays there was a backlog.
__________________
Appreciate 0
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -5. The time now is 04:51 AM.




e90post
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
1Addicts.com, BIMMERPOST.com, E90Post.com, F30Post.com, M3Post.com, ZPost.com, 5Post.com, 6Post.com, 7Post.com, XBimmers.com logo and trademark are properties of BIMMERPOST