Quote:
Originally Posted by DWR
I believe shift time desired is going to be very hard to find, using this method, as I'm guessing it is not a 2 dimensional map. And yet, that has to be one of the most important parameters for many of us. We have our work cut out. Really hoping for a lucky break(s).
|
I guess it depends on the format. I don't know much about code, especially hex code, but I would expect the presentation for desired shift time which is probably between 0.2 and 0.5s to be very different from all other values which the lowest maybe being something like 3 for the 2-1 shift mph minimum and the rest of that table being much higher.