Quote:
Originally Posted by Turkeybaster115
Former boosted IS is the only one who i think has done the install so far. There is a lot of cutting and drilling involved, so I would guess it might take at least 10 hours to install. You can PM him to find out:
http://www.e90post.com/forums/showth...ETT+oil+cooler
|
I have the stage 2 oil cooler and it took 4 hours to install....not to much cutting actually. That is a gret tutorial you linked...helped me a ton when doing mine.
__________________
JB4 G5, Stage 3 LPFP, Stage 2 MOTIV PI, VM 6466 ST, Custom OCC W/ SS lines, ER FMIC, ER CP W/HKS BOV, M3 control arms, M3 guide rods, M3 upper links, M3 front & rear sway-bars, HPA rear toe arms, Wavetrac LSD, HPF Gen 2, DEFIV kit, KW clubsport, Delrin solid SF bushings, stoptech rotors, Rogue Tranny Mounts, 1M bumper, M3 CF hood, M3 fenders, M3 OEM sideskirts, Mtech rear bumper, CSL trunk, MORR VS8.2 rims 245/295