Next, installing the downpipe. Before starting this one needs to buy two stainless steel bolts (M8x35mm or 5/16"x1.25 or 1.5"). Hand tighten the V-band clamp first then install the bolts and allign the exhaust. Then tighten down the V-band and bolts.
When installing the mount, I noticed it didn't quite line up with mount on the downpipe, but that was corrected quite easily. Jess told me that he corrected this after my downpipe was produced.
|